It Is a Wonder Why the Vaudreuil-Soulanges Area Has Been Left Out in the REM Extension Project
Plans are underway for the extension of the light rail transit (LRT) system in Montreal that will cost CAD 10-billion, contribute about $6.3 billion to the GDP of Quebec and create 60,000 jobs during its six-year construction timeline. The Reseau express metropolitain (REM) de l’Est will add 36 kilometers of elevated tracks and 23 new stations. The REM will run from downtown Montreal and will split into two distinct lines that will connect with different boroughs in the east and northeast.
Read More